When might the following safety sign procedure be instigated?
For ALL electrical work
For hazardous work indentified by a risk assessment
For all work above 2 metres
For electrical work at 400v and above
Which ONE of the following requirements is NOT expected to be required of of a qualified electrician?
Be able to read scaled drawings.
Be able to 'mark-out' where all accessories should be fitted.
Be able to mark out the fitting positions of accessories
Be able to interpret 'specialised' engineering drawings
What is the minimum depth for the dimension shown on the floorboard joist shown here?
100mm
25mm
50mm
75mm
Where is this 'capping' used?
To protect cables installed just below plaster depth on a wall.
To protect cables at a depth below 50mm in a wall
To protect ELV cables in a wall
To protect cables in a cavity wall
Which one of the following is not to be relied on for informing persons of potential danger?
barriers
barrier tape
chain fencing
word of mouth
What is shown here ?
portacabin
portaloo
portable storage area
canteen
How can pilfering be reduced on a large, busy work site?
use a lockable storage container
ensure a fence is installed
provide 24-hour security to the site
do not take expensive materials to site
How can the length of time spent on an installation be carefully planned and monitored?
Use of dedicated software
Use of time sheets
Keep a diary
regular site meetings
Who's responsibility is it to 'undertake the installation and be responsible for their personnel'?
main contractor
sub contractor
supervisor
consultant
Who's responsibility is it to 'provide specialist and expert advice '?
main contractor
sub contractor
supervisor
consultant
What publication(s) best support the BS7671:2018 wiring regulations and On-site guide?
EaW 1989
HASAW 1974
Guidance Notes 1-7
Electrical Installations for Electricians by C.Shelton
What document forms the basis for the 'contractual agreement' between contractor and customer?
a contract
a tender
a penalty clause
an verbal agreement
What is the term used to detail 'the monies paid to a customer if a contract is not completed on time'?
liquidated damages
penalty clause
litigation
compensation
Which one of the following items is not a measured item?
20mm steel conduit
2.5mm/sq pvc/pvc cable
100mm cable tray
20mm pvc terminal boxes
What term is given to a work request that is changed by the customer, signed and authorised by them and requiring authorised permission before work commences?